Garment costing
Real cost per garment, while it runs
Stop waiting for end-of-month accounting. See fabric at landed cost and labour at scanned piece rates. A losing style shows itself in week one.
$0 Design · $179 Studio · $450 Factory M — prices on the page.
Running under quote
- Quoted$4.96
- Actual, same part$2.38
01 · The cost sheet
The cost sheet starts in design
BOM, consumption, trims and operations come from the tech pack. Change the fabric and the cost changes.
Labour on the batchexample
- Sewing 20.9 min
- $2.09
- Cutting
- $0.31
- Finishing and packing
- $0.42
- Labour per jean
- $2.82
02 · LabourStudio and up
Labour from the line
Every operation is scanned on the line. Minutes per garment are what happened, and they roll into the cost the same day. If you pay by the piece, the same scans are the payroll.
03 · FabricStudio and up
Fabric at landed cost
What the roll cost to land — not the price on the quote.
04 · VarianceStudio and up
Quoted versus actual, every style
The number you sold at and the number it cost, on one screen, with the difference. That difference is your next quote.
05 · AccountingStudio and up
Accounting underneath
Full double-entry ledger, multi-currency, tax. Every cut, operation and invoice posts as it happens.
My morning routine used to be chasing supervisors for cost updates. Now I check the dashboard with my coffee and know our line margins before the shift even starts.
Rene Zotti · General Manager, INDOPAR
17% below quote
One INDOPAR style: quoted $5.61, actual $4.63 — 13% less fabric used and a 9% lower fabric price, partly offset by higher stitching cost.
Connected to the rest
Costing is where the thread ends. Orders set the price. Materials supply the fabric cost. Production supplies the minutes and the defects. Costing puts them on one line per style and feeds the next quotation.
Questions
Can I cost a style before I have an order?
Yes — on the free Design plan. Cost sheet, margin, what-if on fabric.
Where does labour cost come from?
Scanned minutes × the rate per operation or per operator.
What about my contador?
It's a full ledger. Most factories run it as the book and export to their accountant monthly for filing.
Pricing
See the price. Start today.
Priced by the size of your factory, not per user. Unlimited devices on every plan. Cancel whenever.
- Design Design Teams $0 free, for good
- Studio ≤30 Operators $179 a month
- Factory M 31–100 Operators $450 a month
- Factory L 101–300 Operators $900 a month
- Factory XL 301–700 Operators $1,800 a month
- Enterprise >700 Operators Talk to us
US dollars, per month. Built on a proven open-source ERP; your data stays yours.
Your own GarmentFlow, set up for you.
Your own site, ready in a few minutes. Nothing to install.
Walk around a factory that runs on it Questions first? WhatsApp us