One style, quoted cost and actual cost side by side, with the variance
GarmentFlow ERP · Costing

Know your true margin before the first carton ships.

Stop waiting for end-of-month accounting. See fabric at landed cost and labor at scanned piece-rates. A losing style shows itself in week one.
A cost sheet built from the tech pack's BOM, consumption, trims and operations
The cost sheet

The cost sheet starts in design

BOM, consumption, trims and operations come from the tech pack. Change the fabric and the cost changes.
Scanned operations with minutes per garment rolling into the cost
Labour

Labour from the floor

Every operation is scanned on the line. Minutes per garment are what happened, and they roll into the cost the same day. If you pay by the piece, the same scans are the payroll.
Fabric

Fabric at landed cost

What the roll cost to land — not the price on the quote.
Quoted versus actual for one style, with the difference on the same screen
Variance

Quoted versus actual, every style

The number you sold at and the number it cost, on one screen, with the difference. That difference is your next quote.
The general ledger, with entries posted from cuts, operations and invoices
Accounting

Accounting underneath

Full double-entry ledger, multi-currency, tax. Every cut, operation and invoice posts as it happens.
My morning routine used to be chasing supervisors for cost updates. Now I check the dashboard with my coffee and know our line margins before the shift even starts.
Rene ZottiGeneral Manager, INDOPAR

17% below quote

One INDOPAR style: quoted $5.61, actual $4.63 — 13% less fabric used and a 9% lower fabric price, partly offset by higher stitching cost.

Connected to the rest

Costing is where the thread ends. Orders set the price. Materials supply the fabric cost. Production supplies the minutes and the defects. Costing puts them on one line per style and feeds the next quotation.

Questions

Can I cost a style before I have an order?
Yes — on the free Design plan. Cost sheet, margin, what-if on fabric.
Where does labour cost come from?
Scanned minutes × the rate per operation or per operator.
What about my contador?
It's a full ledger. Most factories run it as the book and export to their accountant monthly for filing.

Priced by the size of your factory, not per user

Unlimited users on unlimited devices, every plan.

  • Studio $179
  • Factory M $450
  • Factory L $900
  • Factory XL $1,800
  • Enterprise talk to us
Book a walkthrough

See your factory in GarmentFlow ERP.

Twenty minutes, no slides, a real factory's data on screen. We reply within one business day.
WhatsApp